Demand Square

Post project requirements and connect with over 1,000+ quality suppliers worldwide

+ Post Your Requirement

Pakistan 200,000-ton soda ash co-production caustic soda project

2026-08-19 16:27:54

0

0

0

The Pakistani owner is planning to build a chemical plant with an annual production capacity of 200,000 tons of soda ash and 2.5 tons of baking soda. Chinese engineering companies have already participated in the project's early stages, and related supporting needs continue to be released. At present, the owner is seeking technical solutions and quotations, paying attention to the adaptability of the ammonia-alkali or combined alkali process route, the integrated solution for the carbonation process of baking soda, and the overall energy efficiency of the plant. Design institutes with experience in the design of soda ash and baking soda are welcome to interface, and can provide basic design, detailed design, and technical services. Suppliers of key equipment such as carbonization towers, calcination furnaces, and drying equipment are also welcome to cooperate.

Basic chemical raw material manufacturing

Pakistan

E - Engineering Design

C - Construction

Open Indefinitely

EPC Project Management Consultancy Requirements for the Bangladesh Refining Project

2026-08-19 16:27:40

0

0

0

The owner of the Bangladesh Petrochemical EPC project has publicly solicited project management consulting (PMC) services, and has completed the collection and screening of intent of interest (EOI) materials. The participating parties must have project management qualifications in the refining field, a mature management team, and verifiable overseas performance. The project covers the entire process management and coordination of oil refining plant construction, and the service content is expected to include progress, quality, cost, HSE, and interface management. Engineering companies and project management institutions with PMC performance in large-scale refining projects are welcome to interface, and can provide project management system setup, on-site management, and client representation services, as well as the ability to operate in an English-speaking environment and comply with international standards.

Petrochemical and Coal Chemical Industries

EPC General Contracting and Project Management

Bangladesh

C - Construction

Open Indefinitely

Design project for desalination plant of crude oil in Bangladesh

2026-08-19 16:27:26

0

0

0

The refining industry in Bangladesh has expressed a need for the design of an oil desalination unit to provide pre-treatment capabilities for the refinery, removing salt and impurities from the oil to ensure the long-term stable operation of downstream units. The project is currently on hold, and may be resumed once the refining investment plan is finalized. Design institutes with experience in the design of electric desalination packages and refinery designs are encouraged to continue to monitor the project, providing technical reserves such as unit design, process selection, and oil adaptability analysis. Suppliers of specialized equipment such as desalination tanks, mixing valves, and high-pressure electric field systems are also encouraged to stay informed and seize the opportunities for supply.

Petrochemical and Coal Chemical Industries

Bangladesh

E - Engineering Design

Open Indefinitely

Bangladesh 100,000-barrel diesel refinery project

2026-08-19 16:27:13

0

0

0

Bangladesh has planned a daily 10,000 barrels of diesel production project from crude oil, aiming to enhance domestic refined oil self-sufficiency and alleviate dependence on imports. The project is currently in a suspended state, and may be restarted once financing and construction conditions are mature. The initial positioning of the plant scale and product scheme has been established. Engineering companies with experience in the design and EPC performance of small and medium-sized refineries are welcome to continue to pay attention, and can provide optimization of the overall process, plant design, and modular construction solutions. Suppliers of refining equipment and catalysts are also welcome to keep track, in order to prepare for bidding and supporting cooperation in advance after the project is restarted.

Petrochemical and Coal Chemical Industries

EPC General Contracting and Project Management

Bangladesh

E - Engineering Design

C - Construction

Open Indefinitely

Egypt Ethanol Production Plant Project Requirements

2026-08-19 16:26:59

0

0

0

An Egyptian state-owned institution is planning to build an ethanol production facility, with the products to be used for industrial solvents and related supporting applications. The facility will use the ethanol dehydration process route, with strict requirements for reaction efficiency, product refining depth, and explosion-proof safety design. Due to internal arrangements by the owner, the project is currently suspended, and may be restarted when conditions are ripe. Relevant technical plans and engineering resources can be pre-stored for matching. Engineering design units with experience in the design of ethanol and similar ether products, and process technology experts are welcome to maintain contact in the areas of process plan verification, engineering design, and key equipment support, and respond quickly to the owner's needs once the project is restarted.

Fine Chemical Manufacturing

Egypt

E - Engineering Design

Open Indefinitely

Demand for iodine-bromine and derivatives plants in Turkmenistan

2026-08-19 16:26:43

0

0

0

Turkmenistan has promoted the engineering design project of iodine, bromine and bromine derivatives plants, relying on the abundant underground brine resources in the country, to build an integrated facility from brine extraction of iodine and bromine to deep processing of bromine-based fine chemicals. The project involves brine pretreatment, blowout absorption, distillation refining and other process units, with high requirements for resource utilization efficiency and product purity. At present, the project has been terminated, but the development of brine resources and the market demand for bromine-based and iodine-based products in the Central Asian region continue to exist, and can be sustained. Technical parties and design units with expertise in brine extraction of iodine and bromine, and with relevant equipment design and engineering performance are welcome to pay attention to similar needs on this platform, and can undertake cooperation opportunities released in the future in the areas of process licensing, engineering design, and equipment supply.

Basic chemical raw material manufacturing

Fine Chemical Manufacturing

Turkmenistan

E - Engineering Design

Open Indefinitely

Turkmenistan soda-caustic soda joint production project

2026-08-19 16:26:29

0

0

0

Turkmenistan plans to build a joint chemical production project in the western Balkan province, producing 100,000 tons of soda ash and 30,000 tons of caustic soda annually, based on the abundant salt resources in the region. The project is currently in a state of suspension, pending the maturation of external conditions, and preliminary studies on resource conditions and product plans have been completed. Design institutes with engineering experience in both soda ash and caustic soda plants are welcome to follow up and keep in touch, providing technical reserves such as process route selection, master plan design, and integrated utility engineering solutions. Suppliers of key equipment such as ion membrane electrolysis and carbonization crystallization are also welcome to stay in touch and seize potential cooperation opportunities.

Chlor-alkali and Salt Chemical Industry

Turkmenistan

E - Engineering Design

Open Indefinitely

Procurement and engineering design requirements for Russian modular refinery stationary equipment

2026-08-17 16:54:12

0

0

0

The project is located in Russia and is in the conceptual design and project estimation phase of a modular refinery. Non-binding technical proposals and budget quotes are sought. The feedstock is medium-sulfur crude oil, and the plant is designed for an outdoor temperature range of -40 to +40°C. Preference is given to modular/bulk handling. The scope includes common pressure reduction towers and in-tower components, reactors, separators, pressure vessels, tanks/drums, desalination, filters, tube-in-shell heat exchangers, and modular handling, among other stationary equipment. Process packages, FEED, or detailed designs may be provided separately, as may installation guidance, commissioning, and training options. Installation and construction are not included, and Russian customs clearance and certification are the buyer's responsibility. Key equipment involves full vacuum to medium-high pressure and temperatures up to approximately 400°C. Heat exchangers are referenced to TEMA/API 660, and corrosion-resistant solutions may involve NACE and 316L composite or lining. The partner must have the capability to design, manufacture, test, and certify stationary refinery equipment and must be able to submit data tables, manufacturing boundaries, and pricing assumptions.

Petrochemical and Coal Chemical Industries

Chemical Engineering Technology Research and Development and Process Package

Engineering Design and Engineering Consulting

EPC General Contracting and Project Management

Russia

T - Technology & Patents

E - Engineering Design

P - Procurement

C - Construction

Closed

Kazakhstan Rural Modular Drinking Water Treatment Prototype Procurement and Integration Services

2026-08-17 16:52:20

0

0

0

The project is in the stage of preparing a pilot plant for the industrialization of scientific research results and seeking technical quotations. It is planned to build an integrated modular drinking water treatment device for rural residents in Kazakhstan, and to integrate the project's carbon adsorption materials for verification. We are now seeking a consortium of partners to undertake the procurement of equipment materials for filtration, aeration, dosing, reverse osmosis, activated carbon adsorption, disinfection, water storage, control, and backup power supplies, as well as coordinating system technologies, and to cooperate in exporting packaging and documentation, international transportation, local customs clearance logistics, installation and commissioning, and personnel training. The design boundaries include operating environments of 10 to 40°C, 220 to 380V power supplies, and hourly tonnage reverse osmosis water production capacity. The output water must meet local drinking water hygiene and public health regulations, and the specific standards, raw water quality, and acceptance methods will be confirmed further. The partner must have the ability to supply complete sets, deliver quality, and install and commission the equipment. The on-site guidance personnel should have relevant experience.

Mechanical and Electrical Equipment and Complete Sets of Equipment

Engineering Installation and Construction Services

Kazakhstan

P - Procurement

C - Construction

Closed

Russian plant oil-based high-grade fatty alcohol integrated facility engineering cooperation requirements

2026-08-17 16:04:49

0

0

0

Russia is in the pre-feasibility/conceptual design and CAPEX preliminary assessment stage for a deep-processed vegetable oil project. The proposed facility will include a 10,000-tonne-per-year C12-C14 high-grade fatty alcohol unit, co-producing stearic acid and distilled/pharmaceutical-grade glycerol. The process encompasses oil hydrolysis, fatty acid fractionation and esterification, methyl ester hydrogenation, methanol recovery, fatty alcohol refining, stearic acid granulation, and glycerol evaporation/distillation.

We are currently soliciting proposals for:
- Process package and technology route comparison
- Basic/detailed design
- Supply of main and auxiliary equipment
- Piping, electrical instrumentation, and automation
- Installation guidance
- Pre-commissioning, commissioning, and performance testing
- Training

Hydrogenation options include high-pressure stirred reactors, liquid-phase fixed-bed, and low-pressure gas-phase fixed-bed routes. Key parameters such as hydrogen balance, sunflower seed oil pretreatment, downstream surfactant unit boundaries, and final product specifications remain to be confirmed.

Collaborators must have proven track records in similar oil chemical projects, hydrogenation, and vacuum distillation, along with capabilities in license coordination, compliance with Russian/EAEU regulations and GOST/TR CU standards, EAC certification, and EPC interface management.

Basic chemical raw material manufacturing

Fine Chemical Manufacturing

Chemical Engineering Technology Research and Development and Process Package

Engineering Design and Engineering Consulting

EPC General Contracting and Project Management

Russia

T - Technology & Patents

E - Engineering Design

P - Procurement

C - Construction

Closed
SRC Posts

俄罗斯连续式热裂解装置固体残渣连续排出系统优化专家寻访

• Closed

62

0

本项目为俄罗斯某公司的试验级连续式热裂解装置技术优化需求。项目方目前希望引入具备连续式热裂解装置运行和/或设计经验的工程专家,对装置中固体炭渣/固体残渣连续排出系统运行不稳定的问题进行技术诊断,并提出结构改造及运行优化建议,目标是支持装置实现不少于 72 小时的连续稳定运行。 本次需求的核心问题集中在连续式热裂解过程中干态固体残渣的稳定排出。现有排出系统可能存在粘结、架桥、压实、堵塞、排出区域瓶颈、密封性或气密性不足等问题,需要专家结合设计文件、工艺文件、运行数据及固体残渣样品检测数据进行综合判断,识别导致排出系统不稳定的根本原因。 专家/顾问的主要工作内容包括:审阅试验级连续热裂解装置的设计文件与工艺文件;分析固体残渣样品及检测数据;评估固体残渣连续排出系统的结构、密封、输送及运行逻辑;提出排出单元或系统的结构改造建议;提出运行工况及操作参数优化建议;必要时赴俄罗斯叶卡捷琳堡现场进行设备审计,评估装置在实际运行状态下的技术状况。 最终希望形成书面工程分析报告,内容包括根因分析结论、推荐改造措施、运行工况优化建议、备选方案、可行性评估及初步实施周期。项目可根据实际需要进一步邀请专家支持改造后排出单元的安装、调试和连续运行验证,确认装置达到连续稳定运行不少于 72 小时的目标。 候选专家应具备连续式热裂解装置运行和/或设计相关实操经验,并具有干态固体残渣连续排出系统方面的成熟经验。专家应熟悉机械结构、材料、热工/热力学、粉体或固体输送、高温残渣处理、密封与气密结构、防粘结、防架桥、防压实等相关技术问题。能够通过视频会议高效沟通,并输出清晰的技术报告。 具备英语沟通能力、国际项目经验,或可赴俄罗斯叶卡捷琳堡现场支持 2–4 周者优先。如专业能力突出,英语能力可不作为强制要求。 参考目标专家来源包括但不限于:BESTON GRO

T - Technology & Patents

E - Engineering Design

S - Site & Revamp

H - Human Resources

Urgent Tasks

Russian Steam Turbine Maintenance Services

• Closed

0

0

Phase 1 includes procedures for complete disassembly inspection, gas generator support repair, compressor rotor/stator repair, combustion chamber repair, and turbine rotor repair. The work scope covers removing all pipelines from the complete machine and disassembling it down to individual parts, cleaning parts, dimensional tolerance inspection, non-destructive testing (NDT), and issuing a GTD defect list to confirm scrapping criteria with the customer; sequentially processing each stage of the gas generator supports, compressor stationary and rotating parts, combustion chamber, and turbine rotor, replacing damaged blades, seals, fuel injectors, thermocouples and other components, repairing coatings and sealing surfaces, and performing component runout control and dynamic balancing. Phase 2 carries out repair work on the turbine stator, power turbine rotor, and power turbine stator, repairing various sealing clearances, nozzles, blade coatings, replacing damaged components, correcting dynamic balance, and completing all turbine stationary and rotor component repairs. Phase 3 performs engine final assembly, mandatorily replacing all original bearings of the drive box; preparing overhaul execution documents and completion reports and communicating with the customer; completing equipment insulation, nameplate, wiring, and overall protective packaging, and transporting the gas turbine engine to the customer's plant using an air-suspension special vehicle. Phase 4 covers the on-site acceptance testing stage. Within 72 hours after the equipment arrives at the customer site, the complete-machine acceptance test run shall be conducted. The test plan is prepared by the contractor and confirmed by the customer; the repaired gas turbine replaces the original unit and undergoes a continuous 72-hour trial operation. The total duration of all procedures for complete machine replacement, repair, and testing shall not exceed 14 calendar days. After the test, a complete set of execution documents shall be submitted.

S - Site & Revamp

With 1,000+ quality service providers, we help you quickly find the right professional team to efficiently solve your chemical project challenges.
+ Post Requirement Now
Over 1,200 requirements have been successfully matched on this platform.
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
Start your cross-border engineering collaboration here
8 to 12 characters, including numbers and letters
FAQ关闭
How can buyers check the progress of project coordination?
After signing in, you can click on the avatar in the upper right corner of the webpage to view the progress and status updates of all connected projects on the "My Account - Project History" page, and communicate with platform customer service at any time regarding project connection matters.
Can the posted project requirement information be modified later?
You can modify the deadline for posted project requirements. This operation can be performed on the "My Account - Project History - My Posts - Service Demand" page. If your requirements have changed, it is recommended to update the information in a timely manner to ensure that suppliers can stay informed of the latest situation.
How to filter suppliers that meet your requirements? How should filter tags be combined to achieve precise matching?
You can use the platform's filtering function to find suppliers that meet your needs. On the "Demand and Supply - Supply Square" page, you can filter by tags such as service type, industry, country/region, and response time. For more precise matching, it is recommended to combine multiple filtering conditions. Start by using primary conditions (such as service type and industry) to narrow down the scope, then use secondary conditions (such as country/region and response time) to further pinpoint your search.
How can buyers post project requirements? What core information needs to be specified?
Purchasers can post project requirements through the following steps: After signing in the platform, click on "Demand and Supply," enter the "Demand Square," click the "Post Your Requirement" button, and fill in the requirement details as prompted on the page. Information to be filled out includes: service type, industry, country/region, project stage, specific requirements, contact information, etc. The more detailed the requirement information provided, the easier it is to attract suitable suppliers.
What is the project onboarding process?
Project Matching Process:
1. Post project requirements / supply capabilities – Share your project needs or what you can offer.
2. Intelligent matching & recommendations – The system automatically matches and suggests potential partners.
3. Initial communication – Get in touch to exchange basic information.
4. Confirm cooperation intent – Both parties agree in principle to move forward.
5. Detailed offline negotiation – Discuss specifics in person or in a formal meeting.
Need more help? Click the chatbot, Silky, on the right side.
How to add to desktop关闭
关闭